Lifting Operation
RA-2026-wThQ7C45 Completed📄 Document Management
Upload documents for different statusesClick or drag to upload document for completed status
Supported: PDF, DOC, DOCX, Excel (Max 10MB)
No documents uploaded yet
Risk Assessment Matrix
| SN | Activity | Hazard | Consequence | Groups Exposed | Controls | Initial Risk | Additional Controls | Residual Risk | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 1 |
Mobilization and transit of heavy mobile telescopic cranes to construction site
|
- Overturning on public roads or internal haul roads
- Collision with third-party light vehicles and pedestrian traffic
- Overhead contact with live overhead utility lines
- Structural bridge collapse due to exceeding axle weight limits
- Brake fade or mechanical steering failure on inclined approach ramps
|
- Multiple fatalities or permanent catastrophic disabilities
- Severe structural damage to public and site infrastructure
- Prolonged vehicular blockage and civil liability claims
- Hazardous fluid spillage into public storm drainage
|
Crane Operator, Escort Vehicle Drivers, Site Logistics Marshals, General Road Users
|
- Conduct Route Survey Assessment prior to dispatch specifying road load capacities
- Secure transportation permits from local transport authorities (e.g., DOT, RTA, ADM)
- Provide certified escort vehicle with amber flashing beacon trailing at 30m distance
- Strictly observe designated maximum haul road speed limit of 15 km/h on site
- Verify driver possesses valid heavy articulated vehicle license and defensive driving certification
- Deploy banksman with high-visibility vest at site entry access gates
- Confirm clear overhead clearance of at least 1.5m above crane boom travel profile
|
P
4
×
S
5
20
|
- Implement real-time GPS tracking and driver telematics to monitor speed violations
- Restrict crane movement strictly to off-peak road hours (22:00 to 05:00)
- Require mandatory pre-dispatch mechanical brake and tire pressure audit checklist
- Comply with ISO 45001:2018 – Occupational Health and Safety Management Systems
- Comply with ILO Convention C155 – Occupational Safety and Health
|
P
2
×
S
3
6
|
|
| 2 |
Ground condition assessment, soil compaction testing, and outrigger pad civil verification
|
- Punching shear failure of crane outrigger foot through soft soil
- Setting up over hidden underground voids, drainage culverts, or live utilities
- Uneven ground settlement leading to crane out-of-level tilt
- Soil wash-out or embankment slope failure caused by rain or dewatering
- Insufficient outrigger mat surface contact area
|
- Catastrophic crane tip-over and structural boom collapse
- Crushing injuries and fatalities of surrounding workers
- Major utility pipeline rupture and site-wide flooding
- Severe asset damage exceeding crane total loss
|
Lifting Engineer, Geotechnical Surveyor, Crane Operator, Lifting Supervisor
|
- Obtain geotechnical Plate Load Test / California Bearing Ratio (CBR) report prior to setup
- Maintain minimum safety clearance of 1.5 times trench depth from edge of un-shored excavations
- Mandate structural engineer sign-off on allowable bearing capacity (minimum 200 kPa)
- Use certified steel spreader mats or engineered hardwood timbers sized via outrigger load calculations
- Locate all buried utilities using Ground Penetrating Radar (GPR) and obtain excavation clearance permits
- Ensure crane level indicator (spirit bubble) confirms 0.0-degree deviation
- Inspect ground integrity daily before and after heavy rainfall or high-tide shifts
|
P
4
×
S
5
20
|
- Install automated settlement monitoring pins around the crane base perimeter
- Require Appointed Person (Lifting) to formally inspect and sign the Crane Pad Handover Certificate
- Mandate re-verification of compaction following any nearby civil trenching activities
- Comply with ISO 45001:2018 – Occupational Health and Safety Management Systems
- Comply with ILO Convention C155 – Occupational Safety and Health
|
P
2
×
S
3
6
|
|
| 3 |
Deployment and fully extended leveling of hydraulic crane outriggers and stabilizers
|
- Crushing of fingers and hands during mechanical outrigger extension
- Structural failure of internal hydraulic stabilizer rams or check-valves
- Incomplete extension of outrigger beams contrary to duty chart settings
- Slippage of outrigger float from non-level or contaminated spreader plates
- Outrigger sinking during hydraulic pressure transfer
|
- Traumatic amputation of rigger digits
- Sudden crane tilting during load pickup
- Total structural failure of crane chassis
- Fatal crush injury against nearby fixed structures
|
Rigging Crew, Mobile Crane Operator, Banksman, Mechanics
|
- Verify 100% full extension of all outrigger beams unless load chart explicitly supports intermediate mode
- Ensure mechanical safety locking pins are fully engaged on all outrigger slider beams
- Position crane floats squarely in the center of timber/steel outrigger mats
- Elevate crane wheels completely off the ground to clear tires of all load bearing
- Verify operational integrity of hydraulic pilot-operated check valves prior to set-up
- Maintain visual contact between Crane Operator and Rigger during cylinder stroke
- Keep hands clear of pinch zones marked with hazard warning stripes
|
P
4
×
S
4
16
|
- Install proximity warning alarms or interlock sensors confirming outrigger deployment
- Conduct daily visual leak audit of all outrigger hydraulic hoses and fittings
- Prohibit crane operations if any single outrigger shoe is not fully planar to the mat
- Comply with ISO 45001:2018 – Occupational Health and Safety Management Systems
- Comply with ILO Convention C155 – Occupational Safety and Health
|
P
2
×
S
2
4
|
|
| 4 |
Tower crane foundation structural inspection, anchor stool embedment, and torque verification
|
- Anchor bolt failure due to insufficient concrete cure strength
- Anchor stool bolt shearing caused by improper torque tightening
- Sub-base structural cracking or shear deflection under cyclic dynamic loading
- Moisture ingress leading to corrosion and fatigue failure of fixing studs
- Omission of high-tensile locking washers or double-nut locking mechanisms
|
- Sudden catastrophic tower crane collapse
- Multiple workplace and public fatalities
- Total destruction of adjacent multi-story buildings
- Substantial financial insolvency and legal prosecution
|
Structural Inspector, Tower Crane Erection Technicians, Site Engineers
|
- Mandate concrete cube test certification confirming 100% specified design compressive strength (e.g., 40 MPa)
- Use calibrated hydraulic torque wrench to tighten anchor bolts to OEM specified values
- Perform Non-Destructive Testing (NDT/Ultrasonic) on 100% of embedded anchor stools
- Obtain Third-Party Structural Engineer Foundation Sign-off Certificate before assembly
- Apply heavy-duty anti-corrosive grease and protective caps over exposed anchor threads
- Install earth-pit bonding achieving electrical grounding resistance under 10 Ohms
- Re-torque all foundation bolts within 100 operational crane hours post-commissioning
|
P
3
×
S
5
15
|
- Implement weekly precision surveyor monitoring for tower plumbness (max allowable 1:1000)
- Require OEM technician sign-off prior to handing over the anchor base for erection
- Fit vibration telemetry sensors on tower stool to detect dynamic cyclic displacement
- Comply with ISO 45001:2018 – Occupational Health and Safety Management Systems
- Comply with ILO Convention C155 – Occupational Safety and Health
|