SUMMER WORKING (HEAT STRESS)
CompletedReference: RA-2026
Total Activities
1
High Risk
0
Medium Risk
1
Low Risk
0
📄 Method Statement
RA FOR SUMMER WORKING (HEAT STRESS) (4).pdf
279.6 KB
pdf
📎 Associated Documents
Documents uploaded for different statuses
Unknown
•
Status Timeline
Current:
Completed
| /RISK ASSESSMENT AND ANALYSIS/تقييم المخاطر |
| RA Number(رقم تقييم المخاطر): PRJ-2026-0002 | :WORKPLACE/TASK/ACTIVITY/PROCESS NAMEالموقع/المهمة/العملية/المعدة 132 kv cable installation | DEPARTMENT/AREA( الإدارة/المنطقة(: Abu Dhabi | |||||||||||
| RA TEAM(Names) (أسماء فريق التقييم): 1. 2. 3. | LEAN CONCRETE POURING | DATE( التاريخ (: NEXT REVIEW DATE( تاريخ المراجعة القادم: APPROVED BY MANAGER/SUPERVISOR(اعتمد من قبل(: Eng. Singniture ( التوقيع(: | |||||||||||
| HAZARD IDENTIFICATION/تحديد الخطر | CONTROL/وسائل التحكم | RISK ASSESSMENT/تقييم المخاطر | ACTION PLAN/خطة العمل لتقليل الخطر | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Item # | Workplace/ Activity/Process/Equipment/Material المواد/المعدات/العمل مهمة/العمل موقع | Hazards/الأخطار | Risks Issue (Possible incident) [What can go wrong] (Accident/ill health to persons, fire or property loss) | Existing Controls / وسائل التحكم المتوفرة | Consequence / الشدة | Likelihood / الاحتمالية | Risk Ranking / تصنيف الخطر | (Improve existing controls / implement new controls) وسائل التحكم والسيطرة الاضافية | Follow up by Whom (name) & By When (date) الجهة المعنية بالتنفيذ/التاريخ | Controls Implemented Yes/No هل تم التنفيذ؟ نعم/لا | Consequence / الشدة | Likelihood / الاحتمالية | Risk Ranking / تصنيف الخطر |
| 1 | Working under direct sunlight in Summer Season | • Heat stroke • Heat exhaustio n • Heat cramp • Heat rash • Heat fatigue • High body temperature • Altered mental state or behaviour • Alteration in sweating. • Nausea and vomiting. • Dry skin. • Rapid and • shallow breathing • Racing heart • rate. • Headache. • weakness, and shallow breathing. | • Organ damage. • neurological effects, • cardiovascular complications, • kidney failure • Dehydration, • fatigue and weakness, • nausea and • vomiting, • dizziness, and • fainting • Muscle spasms and cramps, • pain and discomfort, • Inability to continue • physical activity • Skin irritation • such as redness, itching and discomfort. | • Ensure that Thermal Work Limit (TWL) recommended by the health authority is followed. • No work to be carried out at site • from June 15 to September 15 from 12:30 P. • M. to 03:00 P. • M. as per 2024 year's summer mid- • day break rule. • Provide employees with an • adequate amount of drinking • water and electrolyte • replacement drinks. • No person to work alone, buddy system workers should check on each other to help spot the symptoms, which open, precede to heat stroke. • Provision of rest area with fan, ventilation or air-conditioning as applicable both on job. • Eat lightly, don't take hot or heavy meal, eat salad and fruits • Reduce activity levels. • Schedule outdoor work for the early morning or late evening hours. • Monitor urine colour. . • Encourage the reporting of all signs of heat illness to the supervisor, including feeling faint, dizziness, fatigue, headache, nausea, vomiting and cramps. • Conduct heat stress awareness sessions prior to the commencement of work. • Include heat stress and heat stroke topics in daily Toolbox Talk (TBT) or Safety meetings. . • Follow the mid-day break procedure to allow workers to rest and recover from heat exposure. | 3 | 4 | 12 | • Conduct temperature monitoring at scheduled intervals during the day • Schedule tasks for cooler parts of the day when possible • Educate workers about signs and symptoms of heat-related illnesses | 3 | 1 | 3 | ||
Activity Log
System
•
updated
4 weeks ago
System
•
updated matrix
4 weeks ago
System
•
updated header field: page_number
4 weeks ago
System
•
updated header field: revision
4 weeks ago
System
•
updated
4 weeks ago
System
•
updated matrix
4 weeks ago
System
•
updated matrix
4 weeks ago
System
•
updated
4 weeks ago
System
•
updated header field: assessment_date
4 weeks ago
System
•
updated matrix
4 weeks ago