Edit Risk Assessment

Reference: RA-2026-Oy6szFUZ

← Dashboard

Cable Laying Test

Electrical

Select from dropdown or type custom status

Current: Draft

📄 Document Management

Upload documents for different statuses

Click or drag to upload document for draft status

Supported: PDF, DOC, DOCX, Excel (Max 10MB)

No documents uploaded yet

Risk Assessment Matrix

SN Activity Hazard Consequence Groups Exposed Controls Initial Risk Additional Controls Residual Risk Actions
1
Manual Test Activity
1. Manual handling injuries 2. Slips and trips 3. Working at height
Personal injury, fractures, sprains
All site personnel
1. Provide appropriate PPE 2. Conduct toolbox talks 3. Implement safe work procedures
P 3 × S 3
9
1. Regular inspections 2. Competent supervision
P 2 × S 2
4
2
Electrical Work
1. Electric shock 2. Arc flash 3. Fire hazard
Serious burns, fatality, equipment damage
Electricians, site personnel
1. LOTO procedures 2. Insulated tools 3. PPE (arc flash suit)
P 4 × S 5
20
1. SWMS approval 2. Competent supervision 3. Emergency response plan
P 2 × S 3
6