Cable Laying Test
DraftReference: RA-2026-Oy6szFUZ
Total Activities
2
High Risk
1
Medium Risk
1
Low Risk
0
📄 Method Statement
No method statement was uploaded for this assessment.
Task Risk Assessment Worksheet
Project
132 kv cable works
Client
Taqa
Consultant
Green
Main Contractor
El Sewdy
Subcontractor
Heliopolis
Activity
Cable Laying Test
Assessors
—
Project Manager
signature
—
HSE Engineer
signature
—
Project Manager
signature
—
Civil Engineer
signature
—
HSE Engineer
signature
Risk Assessment Matrix
| SN | Activity | Hazard | Consequence | Groups Exposed | Controls | Initial Risk | Additional Controls | Residual Risk |
|---|---|---|---|---|---|---|---|---|
| 1 | Manual Test Activity | 1. Manual handling injuries 2. Slips and trips 3. Working at height | Personal injury, fractures, sprains | All site personnel | 1. Provide appropriate PPE 2. Conduct toolbox talks 3. Implement safe work procedures |
P
3
×
S
3
9
|
1. Regular inspections 2. Competent supervision |
P
2
×
S
2
4
|
| 2 | Electrical Work | 1. Electric shock 2. Arc flash 3. Fire hazard | Serious burns, fatality, equipment damage | Electricians, site personnel | 1. LOTO procedures 2. Insulated tools 3. PPE (arc flash suit) |
P
4
×
S
5
20
|
1. SWMS approval 2. Competent supervision 3. Emergency response plan |
P
2
×
S
3
6
|
Likelihood / Frequency
| Descriptor | Likely Frequency | Probability |
|---|---|---|
| Frequent | Occurs frequently | 5 |
| Often | Occurs several times per year | 4 |
| Likely | Has occurred more than once | 3 |
| Possible | Has occurred | 2 |
| Rare | Never occurred | 1 |
Risk Matrix — Probability × Consequence
| Probability | Consequence | ||||
|---|---|---|---|---|---|
| Insignificant (1) | Minor (2) | Moderate (3) | Major (4) | Catastrophic (5) | |
| Rare (1) | 1 | 2 | 3 | 4 | 5 |
| Possible (2) | 2 | 4 | 6 | 8 | 10 |
| Likely (3) | 3 | 6 | 9 | 12 | 15 |
| Often (4) | 4 | 8 | 12 | 16 | 20 |
| Frequent / Almost Certain (5) | 5 | 10 | 15 | 20 | 25 |
| 15 – 25 | Extreme Risk | Activity or industry should not proceed in current form. |
| 8 – 12 | High Risk | Activity or industry should be modified to include remedial planning and action and be subject to detailed EHS assessment. |
| 4 – 6 | Moderate Risk | Activity or industry can operate subject to management and/or modification. |
| 1 – 3 | Low Risk | No action required, unless escalation of risk is possible. |