Edit Risk Assessment
Reference: RA-2026-OmHbccij
Water proofing
Electrical
Select from dropdown or type custom status
Current: Draft
⚡ Processing comments in background...
📄 Document Management
Upload documents for different statusesClick or drag to upload document for draft status
Supported: PDF, DOC, DOCX, Excel (Max 10MB)
No documents uploaded yet
Risk Assessment Matrix
| SN | Activity | Hazard | Consequence | Groups Exposed | Controls | Initial Risk | Additional Controls | Residual Risk | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 1 |
Complete HDPE Duct Infill
|
1. Vehicle movement and traffic hazards
2. Manual handling during loading/unloading
3. Uneven ground conditions
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
1. Implement traffic management plan
2. Designated walkways
3. Mandatory PPE
4. Speed limit enforcement
|
P
3
×
S
3
9
|
1. Comply with ADOSH SF CoP 27.0
2. Daily vehicle inspection
3. Toolbox talk
|
P
2
×
S
2
4
|
|
| 2 |
Site mobilization and setup of temporary
|
Passing high-speed public traffic and moving site vehicles
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Approved TTM plan, high-visibility clothing (Class 3), physical water-filled/concrete barriers, advanced warning signs, and trained flagmen.
|
P
3
×
S
3
9
|
Deployment of Truck Mounted Attenuators (TMA) and enforcement of reduced speed limit zone in coordination with local traffic authorities.
|
P
2
×
S
2
4
|
|
| 3 |
Trench excavation and sub-surface ground preparation
|
Accidental strike on existing buried live electrical cables or gas utilities
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Utility mapping review, CAT & Genny cable avoidance scanning, and manual trial pits (pot-holing) prior to mechanical excavation.
|
P
3
×
S
3
9
|
Mandatory Permit to Dig system, use of insulated hand tools near identified utilities, and continuous competent supervision.
|
P
2
×
S
2
4
|
|
| 4 |
Uncoiling, handling, and positioning HDPE pipe
|
Sudden release of stored mechanical spring energy in coiled HDPE pipe
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Use of specialized pipe reeler/uncoiler frame, controlled strap cutting procedures, and establishing exclusion zones.
|
P
3
×
S
3
9
|
Mandatory deployment of safety restraints/bands before unstrapping and wearing high-impact resistant safety glasses and gloves.
|
P
2
×
S
2
4
|
|
| 5 |
HDPE pipe jointing via electrofusion and
|
High-temperature heating elements, hot molten plastic, and portable electrical generators
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Certified welding equipment, RCD-protected generators, heat-resistant safety gloves, and portable fire extinguishers nearby.
|
P
3
×
S
3
9
|
Hot Work Permit implementation, provision of localized exhaust ventilation or respiratory protection (FFP3) in confined areas.
|
P
2
×
S
2
4
|
|
| 6 |
Entry into underground chambers and manholes
|
Hazardous atmosphere (oxygen deficiency, toxic gases like H2S/methane), engulfment, or fall from height
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Confined Space Entry Permit, pre-entry 4-gas atmospheric testing, forced air ventilation, and tripod rescue system with harness.
|
P
3
×
S
3
9
|
Continuous multi-gas monitoring during entry, dedicated trained top-person/standby monitor, and verified emergency rescue plan.
|
P
2
×
S
2
4
|
|
| 7 |
Mechanical winch pulling of HDPE sub-ducts
|
High-tension winch wire snap, rotating capstans, and pinch/nip points
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Properly rated winching wire with calibrated weak-link swivel, emergency stop switches, and safety guards over rotating parts.
|
P
3
×
S
3
9
|
Integrated load monitoring with automatic shut-off at peak tension limits and strict exclusion zones along the tension line.
|
P
2
×
S
2
4
|
|
| 8 |
Duct proving (mandrel testing) and air
|
Uncontrolled high-pressure compressed air release and projectile ejection of foam pig or mandrel
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Calibrated pressure relief valves, secure containment/catcher cage at receiving duct end, clear exclusion zone enforcement.
|
P
3
×
S
3
9
|
Mandatory Pressure Testing Permit, full-face protection shields for operators, and calibrated double-gauge manifolds.
|
P
2
×
S
2
4
|
|
| 9 |
Surface preparation and grit/water blasting on substation roof prior to waterproofing
|
Working at height, high-pressure water jetting, airborne dust and debris near energized equipment
|
Falls from height leading to severe injury/fatality, eye injuries, flashover from water spray hitting exposed live conductors
|
Waterproofing operatives, civil workers, nearby electrical maintenance staff
|
Install full perimeter scaffolding with guardrails, full-body harness tied off to certified anchor points, eye protection (safety goggles/face shield), maintain minimum safe clearance distances from live overhead lines
|
P
4
×
S
5
20
|
Schedule work during planned electrical outage/shutdown where feasible; implement strict Permit to Work (PTW) and mandatory pre-task tool box talk.
|
P
2
×
S
3
6
|
|
| 10 |
Application of torch-on bituminous membrane on electrical switchgear room roof
|
Open flame (LPG torch), LPG cylinder storage, high surface temperatures near cable risers
|
Major fire hazard, severe thermal burns, damage to power cables causing electrical short circuits
|
Waterproofing applicators, site personnel, switchgear operators
|
Issue Hot Work Permit, maintain 2 x 9kg Dry Powder fire extinguishers on-site, clear all combustible materials and cover cable entries with fire-blankets, LPG cylinders secured upright outside switchroom
|
P
4
×
S
5
20
|
Mandatory 60-minute continuous fire watch post torching activity; use non-flammable cold-applied self-adhesive membranes near high-density cable penetrations.
|
P
2
×
S
3
6
|
|
| 11 |
Applying chemical solvent-based liquid waterproofing membrane around live electrical panels
|
Volatile Organic Compounds (VOCs), toxic fume accumulation, flammable vapor ignition from electrical sparks
|
Inhalation toxicity, asphyxiation, explosion/fire within switchroom
|
Waterproofing technicians, electrical engineers inside the switchroom
|
Forced air mechanical ventilation unit installed, continuous VOC/gas monitoring, elimination of all spark sources, use intrinsic safety/EX-rated lighting and tools
|
P
4
×
S
4
16
|
Mandatory half-mask respirators with ABEK1 filters; switch to water-based/low-VOC polyurethane liquid membranes.
|
P
1
×
S
3
3
|
|
| 12 |
Waterproofing cable trenches and basement cable cellars (underground tanking)
|
Confined space entry, hazardous atmosphere, restricted access/egress, proximity to high-voltage cables
|
Asphyxiation, loss of consciousness, electrocution, delayed emergency evacuation
|
Confined space entry workers, safety standby person
|
Confined Space Entry Permit, continuous 4-gas atmosphere testing, dedicated trained Hole Watcher, 110V/battery-operated SELV lighting
|
P
4
×
S
5
20
|
Lockout/Tagout (LOTO) isolation of live cables within trench where possible; tripods and winch retrieval system deployed at access hatch.
|
P
1
×
S
3
3
|