fo cable laying

Draft

Reference: RA-2026-VWtISVNC

Total Activities

4

High Risk

0

Medium Risk

4

Low Risk

0

📄 Method Statement

TSEdN85EIFeFq5KCTf5BMSQgjVrSDS6O9nAc7DJr.docx

Unknown size docx
Client
Consultant
Contractor
Sub-Contractor
Task Risk Assessment Worksheet
Contract No
190707
Ref
RA-2026-VWtISVNC
Date
06.08.2026
Rev
A
Project
132 kv cable works
Client
Taqa
Consultant
Green
Main Contractor
El Sewdy
Subcontractor
Heliopolis
Activity
fo cable laying
Assessors
—
Project Manager
signature
—
HSE Engineer
signature
—
Project Manager
signature
—
Civil Engineer
signature
—
HSE Engineer
signature

Activity Log

System • created