Determination of In-place density and unit weight of soil
RA-2026-Gg2GWoUy CompletedSelect from dropdown or type custom status
Current: Completed
β‘ Processing comments in background...
π Document Management
Upload documents for different statusesClick or drag to upload document for completed status
Supported: PDF, DOC, DOCX, Excel (Max 10MB)
No documents uploaded yet
Risk Assessment Matrix
| SN | Activity | Hazard | Consequence | Groups Exposed | Controls | Initial Risk | Additional Controls | Residual Risk | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 1 |
Mobilization of personnel, vehicles and Delivery of materials to job site
|
β’ Physical hazards while handling materials,2.
β’ Un controlled Vehicle movement,3.
β’ Driver/ Operator fatigue4.
β’ Non- Competent Driver5.
β’ Poor vehicle transport condition6.
β’ Unskilled labor, Vehicle accident,7.
β’ Oil spillage,8.
β’ Vehicle collision
|
β’ Personal Injury,Fatality Property damage,Explosion/Fire.
|
β’ Workersinvolved inthe jobandnearbypersonnel / technician
|
β’ TP NOC and Permits shall be obtained from the concerned authority and follow their safety procedure.
β’ All the workers, staffs and management must undergo with the Project HSE induction prior entry to the site.
β’ The Competent Person shall obtain work permit along approved MS&RA, Job specific checklist.
β’ Valid EID, Medical Insurance shall be attained.
β’ Drivers shall have valid UAE Driving License
β’ Vehicle shall have a valid vehicle license (mulkiya)Conduct awareness training, emergency procedure and Specific Toolbox Talk to all personnel.
β’ Appropriate supervision at all times.
β’ Vehicle/Equipment shall be checked on daily basis and shall be recorded.
β’ Store equipment & tools at designated area only
β’ Ensure to wear appropriate PPE.
|
P
3
Γ
S
2
6
|
β’ Ensure the flagman/banks man is available for vehicle movement control.
β’ Ensure equipment having ROPS (roll over protection system), that operators are safeguarded against roll overs Placement of welfare amenities as per ADOSH SF CoP 8.0 β General Workplace Amenities.
β’ Heat stress management program shall be implemented as per ADOSH SF CoP 11.0 Need to comply with ADOSH SF β MS element 5.0 β Training, Awareness and Competency.
β’ TAQA ESR No.01- PTW
|
P
1
Γ
S
2
2
|
|
| 2 |
Access to the Excavated Pit to perform the test using Cone Machine with Thermal Needle Probe
|
β’ Slip, Trip and Fall Hazard due to poor or improper access/egress2.
β’ Operatives may fall down in to the trench or pit
|
β’ Personal Minor or Major Injury.
|
β’ Technician
β’ Helpers
|
β’ TP NOC and Permits shall be obtained from the relevant authority and follow their safety procedure.
β’ The Competent Person shall obtain Work permit along approved MS&RA;
β’ Tool box talk shall be conducted to all work force on work and related hazards
β’ Only competent and approved persons shall conduct the test using Cone machine & thermal needles Verify valid calibration certificate Cone Machine
β’ Ensure proper access and egress is provide by providing proper ramp/slope or placing by ladder.
β’ Not allowed to keep any material at working area or edge of the excavated area
β’ Ensure no body take shortcuts between the trench and barrication.
β’ Operatives wear PPE, s like hand gloves, safety shoes, googles, Face Mask/dust mask, ear plug, safety helmet.
|
P
2
Γ
S
2
4
|
β’ Need to comply with ADOSH SF β CoP 29.0 β Excavation.
β’ Work area shall be free from obstacles and maintained clean & tidy.
β’ Excavation inspection shall be carried out prior operatives are getting in.
β’ Method Statement and Risk Assessment to be explained to the crew in their own easily understood language.
β’ The trench shall be adequately barricaded along with multi language warning signs and flashing lights
β’ Main 3-point contact while using the ladder.
β’ Face the ladder while climbing up & down Only one person at a time on ladder
β’ Ensure ladder is inspected and colour coded before use.
|
P
1
Γ
S
2
2
|
|
| 3 |
Working with hand tools
|
β’ Use wrong tools2.damaged tools 3.
β’ Homemade tools
|
β’ Personnel injury
β’ Property Damage
|
β’ Technician and helpers
|
β’ Damaged tools should immediately repair or replaced.
β’ Always use good quality hand tools that should be designed to fit the hand and the task.
β’ All hand tools shall be inspected by competent person and put color code
β’ Tools should be properly stored in boxes, racks, holders or pocket belts.
β’ Cutting edges should be sheathed.
β’ Ensure no one is present at the line of fire.
β’ Ensure all are using PPEβs while using hand tools.
β’ Helmet, goggles, hand gloves, safety shoes, mask, coverall with reflective/ reflective jacket.
|
P
2
Γ
S
2
4
|
β’ Not allowed to use any kind of homemade tools
β’ Mushroom headed hand tools shall be removed from service
β’ Damaged and loose handle hammers shall not be used.
β’ Monthly colour coding system shall be implemented for hand and power tools.
|
P
1
Γ
S
2
2
|
|
| 4 |
Manual Handling
|
β’ Lack of awareness of safe manual lifting2.
β’ Manual Handling of materials3.
β’ Slipping/Tripping4.
β’ Sharp edges of material5.
β’ Pinch point6.
β’ Awkward posture7.
β’ Heavy load and bulky
|
β’ Affects the spinal cord Personnel injury
|
β’ Workers,staffconsultant, client, visitors.
|
β’ Toolbox talk and awareness training to be conducted.
β’ Wear necessary PPE, s safety helmet, safety goggles, coverall and safety vest.
β’ Use safe method of lifting (back straight, be close to the load and hold with full grip).
β’ Team handling while handling the pipes.
β’ Keep routes clear and clean.
β’ Use containers for loose material (if required).assess the load and do not lift the load alone take assistance.
β’ When more than one person involved use team leader to coordinate.
|
P
2
Γ
S
2
4
|
β’ Training shall be provided to all concerned staff on βManual Handling,β before the start of the activity.
β’ Watch where you are walking.
β’ Do not run or rush.
β’ Ensure pits are covered.
β’ Check and make sure.
β’ The area is clear.
β’ And need good view to bottom during.
β’ Manual handling.
β’ Need to comply with ADOSH SF β CoP 14.0 β Manual Handling and ErgonomicsIf material handling is doing manually then Bend the knees as much as possible to lift the load.
β’ Lift gradually using leg and stomach muscles.
|
P
1
Γ
S
2
2
|
|
| 5 |
Traffic control (Working near to existing road)
|
β’ Live traffic, 2. speeding of vehicles, public3.
β’ Vehicle movement4.
β’ Road Traffic accident
|
β’ Vehicle accidents, injury, fatality, property damage
|
β’ workersinvolved inthe job andnearbypersonnelincludingstaff, clientsupervisor,visitorworkersinvolved inthe job
|
β’ Clearance must be obtained from appropriate authorities in writing witnessed by the engineers.
β’ Proper planning and supervision are required.
β’ Warning signs, safety cones, safety barriers etc. should be provided.
β’ Detailed method statement should be provided at the time of execution.
β’ Proper warning signs for reduce speed to be used
β’ Workers should have to wear reflective jackets.
β’ Flagman should be employed for controlling traffic, while monitoring the road levels / survey.
β’ Toolbox talk to be conducted prior to the start of work.
β’ Ensure ITC / Municipality permit shall be valid and copy to available at site prior to the start of work
|
P
3
Γ
S
2
6
|
β’ Reduce the speed at working area, provide hard barricading, place warning signs, arrange flagman, warning lights on sign boards and barriers, using high visibility jacket and competent supervision.
β’ Training on working near live traffic, designated drop-off and pickup areas, prohibit crossing roads in non-designated areas.
β’ ADOSH β SF Code of Practice (Cop) 44.0: Traffic Management and Logistics to be followed.
β’ Banksman /Flagman shall have a provision of Beckon lights during the nighttime /under dark & cloudy conditions.
|
P
1
Γ
S
2
2
|
|
| 6 |
Working In the extreme heat/ Humidity
|
β’ Extreme Temperature and Humidity2.
β’ Heat cramp and rashes3.
β’ Heat syncope4.
β’ Heat Exhaustion5.
β’ Heat stroke
|
β’ headache, vomit &dizziness to victim acute spasm of voluntary muscles (ex.
β’ Abdomen extremities)mild red rash in the body.
|
β’ workersinvolved inthe job andnearbypersonnelincludingstaff, clientsupervisor,visitorworkersinvolved inthe job
|
β’ Toolbox talk on heat stress to be provided.
β’ Provide cool drinking water and electrolyte solutions.
β’ Heat Stress Awareness Campaign shall be conducted to increase the awareness of all regarding Heat Stress.
β’ Arrange rest areas away from workstation to cool off.
β’ Ensure that there is air circulation in operatorβs cabin Provide sufficient breaks and job rotation
β’ Supply of adequate cool water Regularly.
β’ Provision of adequate supervision.
β’ Provide adequate welfare facilities.
|
P
3
Γ
S
2
6
|
β’ First Aid /Medical Emergency: Ensure the number of First Aid Boxes are appropriate as per the strength of the team at the site.
β’ ADVET trained and approved First Aider available at the site during throughout the activity.
β’ Comply ADOSH SF CoP 11.0- Safety in the Heat
β’ Adjust work schedule for work and rest periods during hot days
β’ Train workers to recognize signs and symptoms of heat stress disorder and advised to take water at frequent intervals.
β’ Work shall be stopped in bad weather conditions such as high winds /sandstorm and heavy rains and downpour etc.
|
P
1
Γ
S
2
2
|
|
| 7 |
Housekeeping Activity
|
β’ Obstructions2.
β’ Slip, trip and fall3.
β’ Fire hazards
|
β’ Personal injury
β’ Property damage
|
β’ Workers,staffconsultant, client, visitors.
|
β’ Site housekeeping, maintain daily removal of all waste form the site.
β’ Housekeeping should be conducted before work start and end of the shift.
β’ Properly arrange the materials
β’ Work area should be kept clean without obstruction all day.
β’ Secure all temporary signage boards and materials.
|
P
2
Γ
S
2
4
|
β’ Material shall be stacked as per standard height and width.
β’ Overload and unsecure storage of material should be avoided.
β’ Follow waste management plan- Prevention, Reduce, Reuse, Recycle and recovery.
β’ Follow Collection, Segregation, Storage, Transportation and Dispose
|
P
1
Γ
S
2
2
|
|
| 8 |
Adverse weather condition (sandstorm, high winds, rain) Human Factor/ errors/failure
|
β’ Reduced Visibility2.
β’ Slippery Surfaces3.
β’ Wet conditions and Unstable ground condition. 1.stress2.error, mistakes, safety violations3.unsafe acts, lapses,3.poor attitude towards work4.lack of skills 5.wrong/ damage tools
|
β’ Personal injury
β’ Property damage
|
β’ workersinvolved inthe job andnearbypersonnelincludingstaff, clientsupervisorvisitors,workersinvolved in the job Workers, staff
|
β’ Vehicle speed shall be reduced.
β’ Use high visibility clothing.
β’ Regular inspections at work area.
β’ Equipment / materials secured.
β’ Stop work during adverse weather condition.
β’ Provide training regarding adverse weather conditions Emergency Evacuation procedure to be followed.
β’ Provision of First aider and standby vehicles.
β’ Selection of competent and skilled personal Only trained and experienced personnels shall be deployed for the job Sufficient time shall be given to complete the task to reduce pressure/stress Do not allow young or incompetent workers and supervisors for sensitive works
β’ Training shall be given on work/site management and behaviour
β’ Organisational learnings, sharing the incident alerts
|
P
3
Γ
S
2
6
|
β’ Safe evacuation from working location.
β’ If visibility becomes poor driver to pull over in a safe place until it improves.
β’ Drivers to maintain safe distance between vehicles.
β’ Work shall be carried out considering the weather severity level.
β’ Weather alerts shall be monitored.
β’ Wind screen wipers shall be in good condition.
β’ Tool box talk shall be given on the unsafe acts/conditions.
β’ Develop work patterns and systems to minimize fatigue and stress Provide the correct tools for the job
β’ Proper investigation of incidents/ accidents to identify where human error occur
β’ Ensure continuous competent supervision Ensure work is done only as per the approved drawings, permits, MS&RA and work procedures
|
P
1
Γ
S
2
2
|