Cable laying

Completed

Reference: RA-2026-6DuFwJrM

Total Activities

8

High Risk

0

Medium Risk

8

Low Risk

0

📄 Method Statement

No method statement was uploaded for this assessment.

Client
Consultant
Contractor
Sub-Contractor
Task Risk Assessment Worksheet
Contract No
190707
Ref
RA-2026-6DuFwJrM
Date
13.09.2026
Rev
A
Project
132 kv cable works
Client
Taqa
Consultant
Green
Main Contractor
El Sewdy
Subcontractor
Heliopolis
Activity
Cable laying
Assessors
—
Project Manager
signature
—
HSE Engineer
signature
—
Project Manager
signature
—
Civil Engineer
signature
—
HSE Engineer
signature

Activity Log

System • updated matrix
1 month ago
System • updated
1 month ago
System • created
2 months ago