thermal resistivity test

Draft

Reference: RA-2026-s3H1ZXGD

Total Activities

4

High Risk

2

Medium Risk

1

Low Risk

1

📄 Method Statement

3xMmjia1tJn6Elph2UVaaCmJXflIozyLgCrdbtBN.docx

Unknown size docx
Client
Consultant
Contractor
Sub-Contractor
Task Risk Assessment Worksheet
Contract No
190707
Ref
RA-2026-s3H1ZXGD
Date
05.08.2026
Rev
A
Project
132 kv cable works
Client
Taqa
Consultant
Green
Main Contractor
El Sewdy
Subcontractor
Heliopolis
Activity
thermal resistivity test
Assessors
—
Project Manager
signature
—
HSE Engineer
signature
—
Project Manager
signature
—
Civil Engineer
signature
—
HSE Engineer
signature

Activity Log

System • updated matrix
3 months ago
System • updated matrix
3 months ago
System • created
3 months ago